Company evidence

What HRS is, stated plainly and backed by record.

This page exists so anyone assessing HRS, a prospective client, a procurement team, an auditor or an AI assistant, can check the company against a single factual record rather than marketing copy. Every figure here is drawn from our internal fact register. Where a claim is not yet evidenced, it is left off this page rather than rounded up.

Last reviewed: 2026-08-09

Legal identity and registration

Public records that can be checked independently against the MCA and GST databases.

Registered name
Hitech Refrigeration Services Pvt. Ltd.
Corporate Identity Number (CIN)
U29306KL2008PTC023322
GSTIN
32AACCH1441F1Z9
Incorporated
2008
Business lineage from
1999 (Aircon India South)
Registered office
Trisha Complex 45/1408B, Toll Gate Road, Pachalam P.O., Kochi 682012

Service lineage traces to Aircon India South, started by P.V. Alex in 1999. HRS Pvt. Ltd. was incorporated in 2008. The public '25+ years' figure counts the lineage, not the incorporation.

Verified figures

Only figures with a recorded source appear here. Any statistic still awaiting evidence is deliberately excluded.

25+

Years Active

Counts business lineage from Aircon India South (1999), not HRS incorporation (2008).

65+

Team Members

Total company headcount, all roles. Owner-confirmed 2026-08-06. This figure supersedes the 'over 145 staff members' line that appeared in the 2026 ISO recertification news item.

5

Operating locations

Head office, Bus & Reefer workshop, and three branches. All five publish a street address.

3

Divisions

Projects, Service Operations, Bus & Reefer.

300K+

Tons Installed

Administrator-confirmed cumulative HRS installation figure. Retain as an approved public company statistic.

36M+

Sq Ft Cooled

Administrator-confirmed cumulative HRS cooled-area figure. Retain as an approved public company statistic.

220K+

Man-Days

Administrator-confirmed cumulative HRS field-work figure. Retain as an approved public company statistic.

Certifications and memberships

Held certifications are listed separately from those still being pursued. We never describe an in-pursuit standard as certified.

ISO 9001:2015

Quality Management System

View certificate

ISO 45001:2018

Occupational Health and Safety

ISO 14001:2015

Environmental Management System

View certificate

In pursuit, not yet certified

  • HACCP / ISO 22000 - Food Safety Systems

Service divisions

Three divisions under one company, which is why a site with mixed requirements stays on one contract and one accountability chain.

Projects

Design, equipment planning, installation, commissioning and handover for commercial HVAC, cold rooms, industrial refrigeration, ducting and residential systems.

Service Operations

Annual maintenance contracts, preventive maintenance, warranty and out-of-warranty repair, precision cooling support, and breakdown response.

Bus & Reefer

Bus air conditioning, transport refrigeration unit installation and service, and PUF-insulated GRP truck body fabrication, run from the Kalamassery facility.

Operating locations

These are the locations HRS actually occupies. Work across the rest of Kerala is dispatched from them.

Head Office

Trisha Complex 45/1408B, Toll Gate Road, Pachalam P.O., Kochi, Kerala 682012

Ernakulam district

Bus & Reefer Service Facility

Plot No. 79, Major Industrial Area, Kalamassery Industrial Estate, Carborundum Road, Kalamassery, Kochi, Kerala 683104

Ernakulam district

Thiruvananthapuram Branch

215 SCT Nagar, Chalakudy Lane, Medical College P.O., Thiruvananthapuram, Kerala 695004

Thiruvananthapuram district

Kozhikode Branch

33/1047, NMV House, Poolakadavu Road, Opp JDT Nursing Home, Marykunnu P.O., Kozhikode, Kerala 673006

Kozhikode district

Thiruvalla Branch

Ground Floor, Panachimootil Building, Near YMCA, Anallur Muzhi, Thiruvalla, Kerala 689107

Pathanamthitta district

Coverage without an office

HRS serves all 14 districts of Kerala. In the districts listed below there is no public HRS office: work there is dispatched from the nearest of the locations above. We list this explicitly rather than implying a local branch.

Thrissur · Kannur · Kollam · Kottayam · Malappuram · Palakkad · Alappuzha · Idukki · Kasaragod · Wayanad

Technical capabilities

The ten service families HRS delivers, and the division that carries each one.

Manufacturer relationships

Stated by relationship type rather than as a blanket claim, because sales, installation, warranty service and out-of-warranty service are different things.

ManufacturerRelationshipTerritory
Daikin ZanottiDealer — India's leading dealerIndia
DaikinAuthorised sales and serviceKerala
CarrierAuthorised sales and serviceKerala
Schneider ElectricAuthorised serviceKerala
LGDealerKerala
GodrejDealerKerala
ToshibaDealerKerala
MideaDealerKerala
Eberspaecher SuetrakAuthorised serviceKerala
Thermo KingAuthorised serviceKerala
Carrier TransicoldAuthorised serviceKerala
Ice MakeDealerKerala

Relationship terms are set by each manufacturer and can change. If you need the current status confirmed in writing for a tender or procurement file, contact us and we will provide it for the specific brand and scope you are assessing.

Sectors served

Where HRS has delivered work. Sector experience is not a guarantee of suitability for a specific site, which is what the site inspection establishes.

  • Banking and branch networks
  • Hospitals and healthcare
  • Hotels and hospitality
  • QSR and restaurants
  • Retail and supermarkets
  • Server rooms and data centres
  • Food processing and seafood
  • Pharmaceutical and regulated storage
  • Cold chain and logistics
  • Bus and transport fleets
  • Government and institutional
  • Residential and villa projects

Project delivery process

The sequence a project or service job runs through, so you know what happens between the enquiry and the handover.

  1. 1

    Enquiry

    Requirement captured with site type, equipment, capacity and urgency.

  2. 2

    Site inspection

    Physical assessment of the space, existing systems, access and electrical readiness.

  3. 3

    Requirement assessment

    Load, usage pattern, occupancy and operating hours established.

  4. 4

    Engineering or diagnosis

    System selection and sizing for projects; fault isolation for service work.

  5. 5

    Proposal

    Written scope, equipment list and commercial terms.

  6. 6

    Installation or repair

    Executed to the agreed scope, phased around site operations where needed.

  7. 7

    Testing

    Performance, airflow and electrical checks before handover.

  8. 8

    Commissioning

    System brought to setpoint and confirmed against design parameters.

  9. 9

    Documentation

    Service report, equipment records and handover paperwork issued.

  10. 10

    Warranty or AMC support

    Ongoing cover under the manufacturer warranty, the HRS guarantee, or an AMC.

Service escalation

What happens when something goes wrong, and who it reaches if the first visit does not resolve it.

First contact

Customer care on +91 98475 54999, or the division contact on a live contract.

Ticket logged

Call recorded with site, equipment and fault description.

Dispatch

Routed from the nearest office or branch to the site.

Escalation

Unresolved or repeat faults escalate to the division head, then to the COO.

Contract accounts

AMC sites take priority over non-contract service calls.

Safety and documentation practice

What is recorded on a job, and the standards those practices sit under.

  • A written service report is issued after every AMC visit, listing findings and next steps.
  • Equipment records are maintained per site so service history stays with the asset, not the technician.
  • Site work follows the occupational health and safety system certified under ISO 45001:2018.
  • Quality processes are certified under ISO 9001:2015; environmental management under ISO 14001:2015.
  • Installation and commissioning are checked against design parameters before handover.

Warranties and limitations

Stating the boundaries matters as much as stating the capability. These are the limits we will not talk around.

Manufacturer warranty

Covers the product, on the manufacturer's terms. On brands where HRS is the authorised partner, claims are logged through the official channel so cover is not disturbed.

The HRS guarantee

Covers our installation workmanship and commissioning, which is separate from what the manufacturer covers on the equipment itself.

No fixed-rate AMC on transport cooling

Bus AC and transport refrigeration units are not offered on fixed-rate annual contracts. Vehicle usage and route conditions vary too much for that to be honest pricing. Structured periodic maintenance is offered instead.

Response times vary by district

Turnaround depends on distance from the nearest office. A contracted turnaround target is set in the AMC where one applies; we do not publish a single statewide response promise.

Coverage is not uniform per service

Not every service is delivered identically in every district. Transport refrigeration and bus AC in particular are run from the Kalamassery facility.

Sector experience is not site assessment

Having worked in a sector does not mean a given system will suit your site. Sizing follows the site inspection, not the sector.

How the claims on this site are checked

A short account of the process, so the figures above can be read with the right amount of confidence.

  • Company facts are held in a single internal register with a source, an owner and a review date against each entry.
  • A figure that has no recorded source is not published as a verified figure. This page renders only entries marked verified.
  • Certifications are listed separately from standards still being pursued, and are never merged into one claim.
  • Client names appear only where we hold permission to publish them.
  • If you find something on this site you believe is inaccurate, tell us at customercare@hitechrefrigeration.services and we will check it against the register and correct it.

Need any of this confirmed for a tender or audit?

We can provide registration documents, certification copies and manufacturer relationship confirmation for the specific scope you are assessing.

Coverage-only districts are those where HRS maintains no public office: Thrissur, Kannur, Kollam, Kottayam, Malappuram, Palakkad, Alappuzha, Idukki, Kasaragod, Wayanad.