Selected Work

Cooling, owned end to end, across Kerala's most demanding spaces.

A compact overview of installation and service capability across hospitality, food service, healthcare, transport refrigeration, places of worship, campuses and private residences. Each example carries the same operating principle: one accountable partner from first site visit through the years that follow.

01

Hospitality

Wayanad Grand Hotels

Thekkady, Edappally and Nedumbassery·Three-property rollout

A hill-station hospitality brief where the cooling system has to know when to blend in and when to step in.

Guests come to WGH for the climate as much as for the food. A humid afternoon in May feels nothing like a misty morning in November, and the system has to read both. We standardised on a VRF backbone across suites, conference halls and back-of-house, with individual room control and after-hours zoning so the comfort factor appropriately reflects the premium hospitality guests expect. The same standard now runs across three sites: the hill property at Thekkady, the head office at Edappally, and the airport-side property at Nedumbassery.

  • Property typeHill-station resort group
  • SystemVRF + per-suite control
  • CoverageSuites, Conference, BOH
  • SitesThekkady, Edappally, Nedumbassery
Wayanad Grand Hotels - image 1Wayanad Grand Hotels - image 2Wayanad Grand Hotels - image 3Wayanad Grand Hotels - image 4Wayanad Grand Hotels - image 5Wayanad Grand Hotels - image 6Wayanad Grand Hotels - image 7Wayanad Grand Hotels - image 8
08/08
02

Quick Service Restaurant

Devyani International Outlets

Multiple sites, Kerala·Ongoing partnership

A QSR runs on two clocks: dining and kitchen. Both depend on cooling that cannot fail.

Devyani International runs KFC, Pizza Hut and Costa Coffee outlets across Kerala, and each brand puts a different load on the same building. The dining clock cares about how the room feels in the first fifteen seconds after a guest walks in. The kitchen clock cares about whether tonight's stock is still safe at two in the morning. We design each outlet around both: split commercial AC sized for peak walk-in load on the floor, walk-in coolers with redundant compressors at the back, and kitchen-grade extraction that pulls fryer and oven heat away from the line without dragging cool air with it.

  • BrandsKFC, Pizza Hut, Costa Coffee
  • Use caseFront-of-house plus cold storage
  • Cooling stackSplit AC, walk-in cooler, extraction
  • ReliabilityRedundant compressor design
Devyani International Outlets - image 1Devyani International Outlets - image 2Devyani International Outlets - image 3
01/03
03

Transport Refrigeration

Bus AC and Reefer Fleet

Statewide and South India·Authorised: Carrier Transicold, Thermo King

A reefer truck is only as good as its weakest mile. Cargo has to arrive at the same temperature it left.

Our Bus and Reefer division at Kalamassery handles the full chain: in-house body fabrication, branded TRU installation as authorised partners for Carrier Transicold and Thermo King, and roadside response anywhere in South India. The body work focuses on high insulation, low air leakage, sliding strip curtains that reduce air exchange, route-suited temperature range, and easy-opening doors that operators can close quickly during delivery work.

  • CapabilityBody fabrication, TRU install, service
  • Body controlLow leakage + strip curtains
  • SystemsReefer trucks + Bus AC
Bus AC and Reefer Fleet - image 1Bus AC and Reefer Fleet - image 2Bus AC and Reefer Fleet - image 3Bus AC and Reefer Fleet - image 4Bus AC and Reefer Fleet - image 5Bus AC and Reefer Fleet - image 6Bus AC and Reefer Fleet - image 7
01/07
04

Seafood Processing & Cold Chain

Abad Food Services

Mattancherry, Kochi·Processing and despatch cooling

Seafood does not forgive a warm hour. The chain has to hold from the processing floor to the tail lift.

A seafood house runs several temperatures at once: a chilled processing floor that people work in all day, freezer rooms holding finished stock, and a despatch bay where the door opens every few minutes. Each one fails differently. We treat the building as one chain rather than a set of separate rooms, so the despatch bay does not bleed the cold rooms every time a vehicle loads, and the reefer bodies leaving the yard start their run at temperature instead of pulling down on the road.

  • Site typeSeafood processing and despatch
  • ChallengeMultiple temperatures under one roof
  • Chain linkCold room through to reefer despatch
Abad Food Services - image 1
01/01
05

Healthcare

Hospitals and Diagnostic Centres

Pathadipalam, Thrikkakara and Thiruvananthapuram·Clinical and public-area HVAC

In a hospital, air conditioning stops being comfort equipment the moment a theatre door closes.

Wards, waiting areas and clinical rooms sit in the same building but answer to different rules. Public areas are judged on comfort and noise. Clinical areas are judged on air changes, filtration and pressure relationships that have to hold whether the corridor outside is empty at three in the morning or full at eleven. The work spans Kinder Hospital at Pathadipalam, B&B Memorial Hospital at Thrikkakara and Metro Scan at Thiruvananthapuram, and each sets its own band: paediatric and maternity rooms hold steadier and quieter than a general ward, and imaging suites are equipment rooms first and patient rooms second. Planning them means separating those duties early, then building a maintenance rhythm that can be carried out without closing the areas that depend on it.

  • SitesKinder, B&B Memorial, Metro Scan
  • Split of dutyComfort areas versus clinical areas
  • ImagingScanner rooms treated as critical load
  • PriorityUptime and serviceability in occupied wards
Hospitals and Diagnostic Centres - image 1
01/01
06

Retail & Salon

Toni & Guy Kalamassery

Kalamassery, Kochi·Salon floor cooling

A salon floor runs hot in a way the floor plan does not admit to.

Dryers, styling irons and downlights all dump heat at head height, right where the client is sitting, and the room still has to feel calm rather than draughty. Cooling a salon is less about raw capacity than about where the air lands: throw aimed away from the chairs, enough air change to clear product vapour without a noticeable breeze, and quiet operation because the room is a conversation for an hour at a time.

  • Site typeFirst-floor salon in a retail block
  • LoadAppliance heat concentrated at head height
  • Design priorityQuiet, draught-free air distribution
Toni & Guy Kalamassery - image 1
01/01
07

Places of Worship

Churches and Cathedrals

Thiruvalla, Anary and Anaprampal·Congregational HVAC

A church is not just a hall. It is a space that breathes with the calendar.

Sunday mass, weekday catechism and feast days each carry a different cooling load, and a nave with a vaulted ceiling behaves nothing like the office it is often sized as. Across St John's Cathedral at Thiruvalla, Anary Church and Anaprampal Mar Thoma Church we have worked to the same brief: zoned layouts that handle peak congregational density without intrusive noise during services, throw and diffuser placement chosen so nobody in the front pews sits in a draught, and setback schedules that keep energy honest on quieter days. The result is a system that responds to the rhythm of the parish, not just the thermometer.

  • SpaceHigh-ceilinged congregational halls
  • Design priorityQuiet operation during services
  • LayoutZoned cassette and ducted grids
  • ParishesSt John's Thiruvalla, Anary, Anaprampal Mar Thoma
Churches and Cathedrals - image 1Churches and Cathedrals - image 2Churches and Cathedrals - image 3Churches and Cathedrals - image 4Churches and Cathedrals - image 5
01/05
08

Education and IT Campus

Jain Group International and Nirmal InfoPark

Kakkanad, Kochi·Campus HVAC

A campus and an IT park behind one gate, running on two completely different occupancy patterns.

Teaching blocks fill and empty on a timetable. An IT floor holds a steady load from morning until late, and the server rooms behind it never stand down at all. Cooling a shared campus means reading those patterns separately instead of averaging them: classroom and auditorium zones that can be set back hard between sessions, office floors held steady through the working day, and equipment rooms treated as critical rather than comfort load.

  • Site typeShared education and IT campus
  • Load patternTimetabled teaching plus steady office
  • PrioritySetback control without comfort complaints
Jain Group International and Nirmal InfoPark - image 1Jain Group International and Nirmal InfoPark - image 2Jain Group International and Nirmal InfoPark - image 3
01/03
09

Premium Residential

Premium Residential Project

Kerala·Whole-home cooling

The brief was simple. The owner did not want to think about it.

Every cooling decision after that traced back to that one line. We routed a VRF backbone through service corridors so no plant is visible from any living space, fitted slim-line cassettes in each room so the architecture stays the lead, and consolidated control so the household does not chase remotes from room to room. The system stays in the background the way good infrastructure should.

  • Property typeMulti-floor private villa
  • SystemVRF backbone, slim cassettes
  • Owner briefInvisible plant, single-touch control
Premium Residential Project - image 1Premium Residential Project - image 2
01/02

Bring us your requirements

Every notable project starts with a site visit.

Tell us what you are cooling, where, and what the constraint is. We will come and look at the site, scope the work, and put a real number against it.